· Infrastructure

Regional Healthcare Provider

Problem

Legacy on-prem data centre reaching end-of-life with zero tolerance for patient-record downtime.

Outcome

Zero-downtime lift-and-shift to hybrid cloud in 6 weeks; 99.98% uptime in first 6 months.

Key metrics

Uptime (6 months post-migration)
99.98%
Cutover window
4 hrs
Infra cost reduction
34%

What we did

The client operated a single physical data centre running critical patient-record software. Lease expiry gave them a hard deadline — six weeks to migrate or renew at 3× the cost.

We designed a hybrid architecture with Azure as the landing zone and a phased replication strategy that kept the primary workload live throughout. Database replicas ran in parallel for two weeks before the final cutover, which completed in a four-hour maintenance window.

Post-migration we instrumented the environment with structured logging and set up on-call runbooks before handing back. The team now manages the environment with two fewer dedicated ops staff.